Technical indicators:
1. Support color customization (RAL color card, national standard color card)
2. Surface drying: ≤4 hours (25℃, 50% humidity); - Solid drying: ≤24 hours.
3. **Hardness**: Pencil hardness ≥2H (GB/T 6739).
4. **Wear resistance**: Taber method (750g/500 rpm) ≤ 0.03g.
5. **Impact resistance**: 1kg steel ball can fall freely from a height of 1m without cracks.
6. **Adhesion**: Pull-apart method ≥3MPa
7. **Compressive strength**: ≥80MPa
8. Acid resistance (10% H₂SO₄): no blistering or shedding;
9. Alkali resistance (10% NaOH): no change;
10. Oil resistance (engine oil, diesel): no swelling.
11. **Water resistance**: No discoloration or blistering after 30 days of soaking.
12. **Temperature resistance**: -30℃ to 120℃ (short-term impact).

Construction Guide
1. The ground tax rate is <8%; >8% requires dehumidification and drying
2. The ground strength is higher than 25mpa. When it is lower than 25mpa, it is necessary to use our company's water-based hardener to improve the ground strength.
3. Thoroughly polish and clean the floor and repair floor defects.
4. The amount of materials used in one construction is less than 2kg/square meter
5. When the thickness exceeds 2mm, use a defoaming roller for defoaming.
6. The maintenance period after construction is completed is 24 hours to 96 hours.
This website uses cookies to ensure you get the best experience on our website.
Comment
(0)